The Lower Visitor center is now covered in heavy-duty Separator beams, with Titanium beams covering most of the Lower Visitor Center as a second layer over the existing protecting beams
Large separator beams were also installed throughout the Sand Gullet and Other sections of the pit, to ensure that everything stays "wide open".
The Lower Visitor Center was also made energy efficient, to prevent a grid overload