It is, which is good for safety reasons, but annoying for others. New SDGE regs required me to move my new panel 3ft because the existing one was too close to the gas riser, which meant trenching (lots of fun). So I had a different inspector for that. Then somebody else had to do the mandrelling. And then the building ispector wouldn't sign off on final until after I labeled all of my breakers